Tasks completed at MPPC Pipe Coating Plant
-
Control System Design, Parts and Component Selection for all sections of the production line
Main Control Cabinet Design, Installation and Wiring. MCCs included Siemens S7 PLCs, VVVF Electromotor Drives etc.
-
Sensors and Transmitters installation and wiring.
PLC programming for all of the control cabinet throught the production line including Incoming-Pipe section, Shot Blaster, Primer, Coating, Quenching and Bitumen/Bituseal Storage tanks
Human Machine Interface (HMI) Installation and Programming
Lighting System Design and Installation
Lightening System Design and Installation
Earth System Design and Installation