Tasks completed at MPPC Pipe Coating Plant

  • Control System Design, Parts and Component Selection for all sections of the production line

  • Main Control Cabinet Design, Installation and Wiring. MCCs included Siemens S7 PLCs, VVVF Electromotor Drives etc.

  • Sensors and Transmitters installation and wiring. 

  • PLC programming for all of the control cabinet throught the production line including Incoming-Pipe section, Shot Blaster, Primer, Coating, Quenching and Bitumen/Bituseal Storage tanks

  • Human Machine Interface (HMI) Installation and Programming

  • Lighting System Design and Installation

  • Lightening System Design and Installation

  • Earth System Design and Installation